W190: 7-Stage Nutro Stainless Steel Pretreatment Washer
Design: 2’-0” W x 5’-8” H Opening, 6 FPM
System Overview:
- Opening Size: 2’-0” wide x 5’-8” high
- Part Size: 1’-6” wide x 5’-0” high x 6’-0’ long (modifiable)
- Line Speed: 6 fpm (Can be reconfigured)
- Dimensions: 103’-6” Long 8’-4” wide, 11’-2” tall + fans & burners
- System was installed new in 2015/16
- Excellent system that can be reconfigured as needed to suit your requirements
- Item Listed on 10/10/2023, Removal starting October 2023
Process Stage | Length
|
Time Sec.
(6 FPM) |
Temp °F
/ Btu’s |
Risers Sets (9” O.C.) | Nozzles
(est) |
Tank
Cap. (est) |
GPM
/ HP |
Entrance | 7’-6” | ||||||
Stage 1 (Clean) | 7’-6” | 75 | <140° / 2,000,000 | 15 | 150 ea | 1,250 | 308 / 10 hp |
Drain | 8’-8” | ||||||
Stage 2 (Rinse) | 2’-3” | 23 | Ambient | 4 | 40 ea | 700 | 112 / 5 hp |
Drain | 4’-6” | ||||||
Stage 3 (Rinse) | 2’-3” | 23 | Ambient | 4 | 40 ea | 700 | 112 / 5 hp |
Drain | 8’-11” | ||||||
Stage 4 (Phosphate) | 15’-9” | 160 | <130° / 2,500,000 | 22 | 220 ea | 2,400 | 618 / 20 hp |
Drain | 9’-0” | ||||||
Stage 5 (Rinse) | 2’-3” | 23 | Ambient | 4 | 40 ea | 600 | 112 / 5 hp |
Drain | 8’-8” | ||||||
Stage 6 (Rinse) | 5’-3” | 53 | <130° / 1,000,000 | 8 | 80 ea | 950 | 224 / 7.5 hp |
Drain | 8’-3” | ||||||
Stage 7 (Sealer) | 3’-3” | 23 | Ambient | 4 | 40 ea | 950 | 112 / 5 hp |
Exit w/Halo | 10’-6” | 2 | |||||
Total Process length | 103’-6” |
- Dimensions shown are subject to final confirmation.
- Washer ships in multiple sections.
- All 304 SS Construction
- Gusher Stainless Steel Wetted-End Pumps
- All CPVC & PVC Plumbing
- Eclipse ImmersoJet Burners on Heated Stages with Gas Trains
- Entrance and Exit Exhaust Fans
- System Control Panel with Prints
- Ships on Multiple Semi Trailers, AIS will load.
- AIS can provide modifications or refurbishments as needed.
Price – $275,000 As-Is, Removed and Loaded on Trucks
Call Nick @ 920-361-5208 x 2 for questions or email to nick@americanindustrialsystems.com